02/13/19: 1Hr 1. The frame was adjusted to comply with the dimensions shown in Figure 3. Step 2 was worked on.
02/14/19: 2.83Hrs 2.C-01203A&B were fluted until the curve was flushed with the curve of the canopy frame. 3.Both C-01203A were used to match-drill #30 the frame, the same was performed for both C-01203B-1. 4. same for C-01203B-1 02/19/19: 5.35Hrs Worked on step 5 and reworked step 1 by readjusting the frame
02/20/19: 0.5Hrs 5. C-01203A&B were deburred and riveted to the canopy frame