KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  2-13-2019
Number of Hours:  9.95
Manual Reference:  
Brief Description:  39iS/U-02

02/12/19: 5.35Hrs
1. Both C-1216 gas struts were final drilled 17/64 on the forward side and 3/8 on the aft side.
2. The canopy frame was countersunk #12 in 2 locations to fit an AN509-10R13 screw.
3.Five holes were match-drilled on each side of the canopy frame and then LP-3 rivets were installed.

02/13/19: 4.6Hrs
The center of the bow was filed to create a smooth transition between the welded parts.
The canopy frame arms were beveled.
The C-1216-1 gas struts were attached to the frame.
Measurements on the manual were followed to use C-01215-1 to match-drill the canopy frame, C-01215-1 was then riveted to it.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.