KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  11-19-2019
Number of Hours:  14.18
Manual Reference:  
Brief Description:  35iS/U-02

02/07/19: 5.35Hrs
3. The U WHLNW51CCWHEEL was split removing the bolts.
4. The nut and washers were removed.
5. The tire was inflated slowly then deflate then re-inflated slowly.
6. The main wheel assembly was aplit removing the cap crews.
7. The nut and washers were removed from the valve stem of the U 5:00X5-6IT Tube
8. The tire was slowly inflated and deflate till there were no wrinkles.
9. The bearings were fully greased and reinstalled

02/08/19: 3.83Hrs
3-9 Second wheel
10.Pipe thread sealant was applied to the threads of the fluid fittings.

11/19/19 5 Hrs
1. Final drill was done with a step drill to the two holes of 0.188" which are located at the top of the Assembly Firewall which the holes had to be 3/8" making sure that the drilling was perpendicular to the vertical face of the Firewall Assembly.
2. The engine mount was screwed to the Firewall Assembly using the hardware..
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.