01/22/19: 6.6Hrs 1. A-1202B and A-1202A-R to the right flaperon spar assembly and were pinched to make sure they laid flat against the ribs. Step 2 was worked on for the right flaperon.
01/23/19: 7.25Hrs Step 2 was worked on for the right flaperon but paused it. A-1202B and A-1202A-L to the left flaperon spar assembly and were pinched to make sure they laid flat against the ribs. 2. A-1202B and A-1202A-L were riveted to the assembly. Step 3 was worked on for the left flaperon.
01/24/19:10.93Hrs 3.A-1201C-L was clecoed and riveted to the left flaperon assembly. 4.A-1201A-L was clecoed and used to match-drill #30 holes into A-1210-L&R, the other #40 holes on A-1210-L&R were final-drilled #30. 5. A-1201A-L was deburred, as well as A-1210-L&R, and riveted to the flaperon assembly. A-1201B-L was riveted to the assembly. MDM3614M had loctite 243 applied and were installed to the assembly.