01/24/19: 7.1Hrs 2. W-1201-L was dimpled in two places as instructed. 3. The W-1201A doubler was clecoed to the skin. 4,5 . Eight holes were final-drilled #20, then the doubler was un-clecoed and it was deburred along with the skin. 6,7 The skin was completely clecoed and riveted to the skeleton.
06/28/19: 8.83Hrs 8. The #30 hole used for the tie-down was final-drilled 3/8. 9. The W-1203-L was clecoed and riveted to the skeleton. Step 10 was worked on.
07/01/19: 0.33Hrs 10. The W-1202-L sking was clecoed and riveted to the skeleton.