01/21/19: 3.5Hrs Nose ribs were clecoed and riveted to the left spar and to their respective flange in the following order: 1. 5 aft-trimmed, fwd-untrimmed W-1208-R. 1 aft & fwd untrimmed W-1208-R. 1 aft & fwd untrimmed W-1208-R with two nutplates. 1 aft & fwd untrimmed W-1208-R. 4 aft-untrimmed, fwd-trimmed W-1208-R.
01/22/19: 2Hrs 1 aft-untrimmed, fwd-trimmed W-1208-L. 1 aft&fwd trimmed W-1208-R with one nutplate and W-00028 attached.
6. The left stub spar was clecoed and riveted to the forward flange of the 6 most inboard nose ribs. 7. 14 snap bushings were installed. 8. 12 holes/rib were dimpled #30 on the 2nd to last and 3rd to last most inboard ribs.