01/18/19: 4.33Hrs 6 W-1210-L had their forward flange trimmed. All of the W-1210-R had their forward flange trimmed. All of the ribs were deburred.
01/19/19: 1.5Hrs 1-4 All of the W-1210-L&R were fluted. 5. One W-1210-L with the forward flange trimmed had 10 holes match-drilled #30 using W-1210B-L as a guide, the same was done for one W-1210-R using W-1210B-R as a guide. 6. Two W-1210-R were match-drilled #30 using W-1216 and W-1216B-L. 7.One trimmed and one untrimmed W-1210-L were match-drilled #30 using W-1216 and W-1216B-R.
01/21/19:1.16Hrs 8-9. W-1210B-L was riveted to its match-drilled W-1210-L and W-1210B-R was riveted to its match-drilled W-1210-R.