01/17/19: 1.66Hrs 1-3 The aft flange of 13 W-1208-L ribs was trimmed, 5 of those 13 had their forward flanges trimmed as well. 4. The remaining W-1208-L with the aft flange untrimmed had its forward flanges trimmed 5. The aft flange of 7 W-1208-R was trimmed and 2 of those seven had their forward flanges trimmed.
01/18/19: 3.6Hrs 6. 4 of the seven W-1208-R with the aft flange untrimmed had their forward flanges trimmed. 7. Both W-1216B were separated. 8. One of each of the W-1208-L&R had one hole final-drilled #19 and two holes dimpled in order to install one nutplate. W-00028 was also installed. 9. 1 of the 3 completely untrimmed W-1208-R had 2 holes final-drilled #19 and four holes dimpled in order to install 2 nutplates.