KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  1-8-2019
Number of Hours:  3.18
Manual Reference:  
Brief Description:  09iS/U-05

1. HS-1214 were separated.
2. HS-1214 were riveted to the aft spar.
3. Both hing halves were labeled.
4. Masking was applied to both hinge halves at their 6th and 20th hole.
5. Match-drilled #30 a total of 33 holes on each of the hinge halves using the match-drill template.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.