KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  11-14-2018
Number of Hours:  14.68
Manual Reference:  
Brief Description:  10iS/U-02

1,2 The tailcome skins were indentified and prepared
11/13/18: 6.68Hrs
3,4 F-1210 was fluted on two locations until the curvature was met.
Most of the fuselage frames were fluted in order for the holes to be as alligned as possible.
5. F-1208A was riveted to F-1208-R.
6,7 F-1208 L&R and F-1209 L&R were riveted together.
8. F-1210B and F-1210C were clecoed to F-1210L&R, this was used to match-drill two #30 holes onto F-1210A L&R.
9. Four holes were final-drilled #12 on F-1210B.

11/14/18: 8Hrs
The tailcone skins were identified, deburred and the edges were broken as specified on the manual.
10. F-1210A L&R, F-1210B and F-1210C were riveted together
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.