11/10/18: 2.5Hrs Steps 1 through 5 were worked on according to service bulletin 18-02-02.
11/13/18: 4.5Hrs It turns out bulleting 18-02-02 does not apply to our manual's version. Back to square one (step 5 still applies and it will not have to be worked on again): 1.. HS-0123A-1 was countersunk #40 in a total of 16 holes. 2. HS-0123A-1 was separated. 3. Two inboard hinge brackets were riveted according to the manual. 4. Two outboard hinge brackets were riveted according to the manual. 6. HS-1209 was countersunk #40 in a total of 16 holes. 7. HS-1209 was separated into 8 parts. 8,9 HS-1209, HS-1212-1 and HS-01211-1 were clecoed together according to figure 6 and riveted using only 2 rivets per spar cap spacer. a total of 16 rivets were installed.