11/09/18: 6.85Hrs 1. The skin was clecoed to the skeleton, there were some deformations on the skin, we un-clecoed and clecoed again after making the radius of one of our ribs bigger whilst removing more material. 2. Even though we did this the little deformation on the skin persisted, which checking on forums it seems to be a common occurence. 3. The skin was riveted to the skeleton, leaving the 12 holes on the top open.
11/10/18: 1Hr 5,6 The upper hinge was attached using the hardware called out. Instead of using a string to attach the hardware of the lower hinge, this was put in a bag which we have identified as the lower hinge hardware.
Step 4 pending after painting
12/03/20 .7 Hrs Step 4: The VS-1204 was screwed to the nutplates at the front of the V-Stab assembly