10/31/18: 4.6Hrs 1. T-01233 was sanded in order to slide it 1/2in into FLF-00017 with a tight fit. 2. Sealant was placed to the outside of T-01233 and inserted LF-00017. 3. VA-265 was threaded and given its clocking pointing aft. 4. FLF-00017 was threaded into T-01232 making sure it went through the bushing inside of the tank. 5. Sealant was applied to the flange of IE-00001X then attached to the tank assuring its orientation. 6. Sealant was applied to T-1209 and attached to the tank. 7. Sealant was applied to the flange of IE-385B and attached to the tank.
10/31/18: 6.02Hrs The tank was cleaned. Section 26 was documented.