KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  10-19-2018
Number of Hours:  7.69
Manual Reference:  
Brief Description:  24iS/U-04

10/11/18: 4.53Hrs
1,2. The roll bar was clecoed to the F-1231Ds and it was match-drilled #30 in a total of 24 places.
3. F-1231Ds were deburred and primed, then they were re-attached to the fuselage.

10/19/18: 3.16Hrs
4. The roll bar was clecoed and riveted to the F-1231Ds.
5. The roll bar support assemblies were riveted to the roll bar and to the fuselage.
6. F-1231Ds were tightened.
7. Two holes in F-01224L-1 were final-drilled #19.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.