KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  2-18-2020
Number of Hours:  30.04
Manual Reference:  
Brief Description:  24iS/U-02

10/05/18: 9.61Hrs
1. All of the parts that conform the roll bar, were clecoede.
2. Roll bar bases were filed.
3.F-1231D's were bolted to F-01205B L&R.
4.The roll bar was clecoed to F-1231D.

10/08/18: 2.83Hrs
5.All of the #40 holes on F-1231A-FL, FR, AL, AR and F-1231B&C were final-drilled #30

10/09/18: 8.343Hrs
6.Three holes were match-drilled #30 on -01213A.
7.The parts were deburred.
8. The outer flanges of F-1231A FL, FR, AL and AR were countersunk #30.

10/10/18: 7.35 Hrs
9.Five holes were countersunk #30 in C-01213A.
10.Five holes were countersunk #30 on F-1231A FL and FR.
11.A hole was match-drilled #43 into F-1231A-AR and F-1231E using F-01231F-2

10/11/18: 1.33Hrs
12.Previous hole was Final-drilled #30.
13.The parts were deburred and the previous goles was tapped #4-40 on F-01231F-2.
14.The flanges were riveted along the roll bar assembly.

02/18/20: 0.58Hrs
15: F-1231E, F-01231F-2 and C-01213A&B were riveted to the roll bar.
16. All along the flanges of the Roll Bar Assembly was riveted from the center to the edges, and did periodically checks for flatness.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.