9/28/2018 2Hrs 1. 8 holes were dimpled #40 on F-01207B-1. 2. 4 nutplates were riveted onto F-01207B-1. 3. F-12108A was riveted onto F-01207B-1. 4. F-1286A L&R was riveted onto F-01207B and F-1206G L&R. 5. F-01268B-L was riveted to F-012868A-L. 6. F-01268B-R was riveted to F-012868A-R. 7. Bushings were installed into the holes of F-01207B.
Step 8 pending (after painting)
11/28/2019 0.66Hrs 8. The section where the F-1204N Fuel tank Pad will be placed was cleaned with alcohol. The adhesive backing from F-01204N was removed and then positioned on the edge of the F-01224-L-1 & -R-1 Baggage Floor flanges according the specifications for a good bond.