Date:  9-18-2018
Number of Hours:  17.32
Manual Reference:  
Brief Description:  21iS/U-02

9/17/18 7.32Hrs:
2. A total of four F-01241 plastic bars were cut, match-drilled and countersunk.
3. A hole on F-01224R was enlarged to 5/8.
4. Holes along the edges of F-01224 L&R were dimpled #30 and #40 as well as the ones on the access holes.
7. The holes on F-12107A were countersunk #40.

9/18/18:
10Hrs
5. Nutplates around the access holes of F-01224 L&R were installed.
6. The baggage floors were riveted to the center section bulkhead.
8. F-12107A, F-12107B and F-12107C were riveted together and nutplates were installed.
9. The ELT Bracket assembly was riveted to F-01223R and F-01222R.