Date:  10-18-2018
Number of Hours:  18.50
Manual Reference:  
Brief Description:  20iS/U-05

9/14/2018: 2hrs
Started riveting F-1204L

9/17/2018: 10.5hrs

1.F-1204P L&R were riveted to F-1204.
2. 8 holes of F-1204 L&R were riveted to F-01204D-1.
3. The F-01204D-1 was clecoed to the F-01204-1
4. The F-01204G-L & -R were clamped to the F-1204-1.
5. Final-drilled #30 a total of 16 holes on each of the F-1204G.
6. The clamps were removed.
7.- Clecoed the new #30 holes
8.- Final-drille #30 the rest of the holes.
9. .F-01204D-1, F-01204F-L-1 & -R-1, and F-01204G-L & -R were removed.
10.F-01204D-1, F-01204F-L-1 & -R-1, and F-01204G-L & -R were riveted to F-01204-1.

10/18/2018: 1Hr
Worked on step 11, cherry rivets didn't work.

04/01/2019: 5Hrs
Rivets from step 11 were finally installed.