1.F-1204P L&R were riveted to F-1204. 2. 8 holes of F-1204 L&R were riveted to F-01204D-1. 3. The F-01204D-1 was clecoed to the F-01204-1 4. The F-01204G-L & -R were clamped to the F-1204-1. 5. Final-drilled #30 a total of 16 holes on each of the F-1204G. 6. The clamps were removed. 7.- Clecoed the new #30 holes 8.- Final-drille #30 the rest of the holes. 9. .F-01204D-1, F-01204F-L-1 & -R-1, and F-01204G-L & -R were removed. 10.F-01204D-1, F-01204F-L-1 & -R-1, and F-01204G-L & -R were riveted to F-01204-1.
10/18/2018: 1Hr Worked on step 11, cherry rivets didn't work.
04/01/2019: 5Hrs Rivets from step 11 were finally installed.