Powered By Kitlog Pro v2.0
GA Aerospace’s Web Site
RV-12iS A
Avionics
5-17-2019
< Previous Log Entry
Next Log Entry >
Date:
5-17-2019
Number of Hours:
7.00
Manual Reference:
Brief Description:
38iS/U-22, 42MiS/U-14, 42MiS/U-15
38iS/U-22:
We started to trim the right wing.
42MiS/U-14:
The X3 connector was fully assembled.
The K-6284 was routed, according to Van's, it should be routed from the firewall to the terminal B grounds.
We worked on step 8.
42MiS/U-15:
W6079 was connected to the EarthX fault wire.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
RV-12iS A Home
Category
# Logs
# Hours
All
415
3504
Avionics
28
237
Batteries Log
1
Empennage
30
233
Engine
1
2
Finish Kit
83
612
Fuselage
92
885
Inventory
3
20
PAP
8
Powerplant
35
371
Service Bulletin
24
37
Tools
1
18
Training (Emp. Team)
11
68
Training (Fus. Team)
25
336
Training (Wings Team
21
215
Wings
52
470
Copyright © 2001-2024 Matronics. All Rights Reserved.