Powered By Kitlog Pro v2.0
GA Aerospace’s Web Site
RV-12iS A
Powerplant
11-21-2018
< Previous Log Entry
Next Log Entry >
Date:
11-21-2018
Number of Hours:
15.30
Manual Reference:
Brief Description:
47iS-02, 47iS-03, 47iS-04
47iS-02:
1: NA
2: NA
3: NA
4: Tutorial to safety wire the caps can be found on YouTube.
5: 118 degrees appear to be the standard angle for drill bits, the grinder has a set-up at that angle.
6: We started tapping with a tap die, and continued with the screw.
47iS-03:
1: NA
2: NA
47iS-04:
1: NA
2: The material should be removed very carefully because the bottom part of it needs to be saved.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
RV-12iS A Home
Category
# Logs
# Hours
All
415
3504
Avionics
28
237
Batteries Log
1
Empennage
30
233
Engine
1
2
Finish Kit
83
612
Fuselage
92
885
Inventory
3
20
PAP
8
Powerplant
35
371
Service Bulletin
24
37
Tools
1
18
Training (Emp. Team)
11
68
Training (Fus. Team)
25
336
Training (Wings Team
21
215
Wings
52
470
Copyright © 2001-2024 Matronics. All Rights Reserved.