KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  7-16-2019
Number of Hours:  3.75
Manual Reference:  
Brief Description:  35iS/U-06, 42CiS/U-07

35iS/U-06
The brake lines were installed.

Worked on 42CiS/U-07 by studying the ELT, it turns out that the DIN connector that the ELT manual calls for being fabricated already came with our main harness.

42MiS/U-04
AV-00012 antenna was installed.

42MiS/U-12
The XPNDR cabble was attached to AV-00012.

42CiS/U-11
The OAT probe was tightened using the plastic nut.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.