KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  8-4-2018
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Sec 39 Page 39iS/U-05

Date: 8/4/18




Page 39iS/U-05:



1. NA



NOTE: Most of the work that went into the canopy was trying to fulfill the requirements of the dimensions of step 2 of page 39iS/U-05 which we concluded couldn’t be completed because we needed other parts to be installed to accurately measure the distances.
To allow the canopy to make full contact with the bow we had to use some files to make a notch along the line that’s shown in the pictures
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.