Worked on page 36A-09 and performed step 7, but first we have to separate the parts and remove the excess of proseal, this was important for installing the hardware. On step 7 we had a problem with the rivets, they were too short. We used a different rivet, we used BACR15DR3AC3 that replaced CCR-264SS-3-2. Once that the step was finished, we worked on page 36A-10 and did the steps 1 to 4. We secured the template to the fairing and checked the alignment, then we drilled four holes #19. We removed the template and put the #8 screws. When the part was ready we drilled all the holes #40 and after that we did the dimple