Brief Description: Sec38, Pages 38iS / U-11 and 38iS / U-20
June 27, 28, 30th In these days step 3 4 38iS / U-11 was made to carry out this step it was necessary to place tape around where the sealant would apply and then was attached with clamps, step 4 38iS /U-11 was started doing final drill # 22 for able to slide the screws through the skin and screw with the nutplates. Step 7 38iS / U-20 was also performed. A plastic tape that is placed between the bulkhead and the fuel tank was covered with tape because later the area where it is placed will be painted.