KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  6-20-2018
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Page 28is/U-02 and U-03

Today we worked on steps 1 and 2 38iS / U-02 first the Right Fuselage Pin was made starting with the tap in the hole in both WD-1217C using a Tap for screw 10-24, then the spring was inserted and WD-1217C into the WD-1217 then inserted a bushin into a screw and this was screwed to the part WD-1217C, finally we applied loctite #243 to the screw.

At the end of the day, steps 1 2 3 38iS / U-03 were started by cutting the part F-1261 into 4 pieces of 44.5 mm (1 3/4 ") each, then a match-drill # 30 was made on parts F-1261s and WD-01214-L-1 & -R-1 Finally, the pieces were removed and each hole was burned to then perform final-drill # 12 only to the holes of the part F-1261s.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.