KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  8-19-2020
Number of Hours:  0.80
Manual Reference:  
Brief Description:  N-19-10-16

8/19/2020 0.80Hrs
Black nylon step plugs were installed.

Step 1: The bottom surface of the steps were drilled #40.
Step 2: The inside of the step was cleaned.
Step 3: A thin strip of fuel tank sealant was applied around the inside of the steps.
Step 4: Tthe step plugs were insterted into the ends of each step.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.