KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  10-27-2020
Number of Hours:  1.50
Manual Reference:  
Brief Description:  N-19-10-16-1

08/14/20 1.5Hrs

1: The bottom surface of the step was drilled a hole #40.
2: The inside of the step was cleaned and clear of debris.
3: A thin smear of fuel tank sealant or adhesive was applied around the inside of the steps.
4: The step plugs were inserted into the ends of each step.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.