Powered By Kitlog Pro v2.0
GA Aerospace’s Web Site
RV-12iS A
All
7-23-2019
< Previous Log Entry
Next Log Entry >
Date:
7-23-2019
Number of Hours:
9.00
Manual Reference:
Brief Description:
12-04, 38iS/U-15, 38iS/U-20
12-04
The vertical stabilizer and rudder were reinstalled.
38iS/U-15
The rudder cables were reconnected.
38iS/U-20
Worked on installing the bagagge area covers.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
RV-12iS A Home
Category
# Logs
# Hours
All
415
3504
Avionics
28
237
Batteries Log
1
Empennage
30
233
Engine
1
2
Finish Kit
83
612
Fuselage
92
885
Inventory
3
20
PAP
8
Powerplant
35
371
Service Bulletin
24
37
Tools
1
18
Training (Emp. Team)
11
68
Training (Fus. Team)
25
336
Training (Wings Team
21
215
Wings
52
470
Copyright © 2001-2024 Matronics. All Rights Reserved.