7A-02: All of the steps were completed on the optional installation of the trim tab that goes on the rudder. We did prime the mating parts to prevent corrosion underneath.
50iS/U-08: We installed a new hose that's called out in revision one which is H175 along with two HW-00011 clamps.
50iS/U-11: We received our new F-14103 on which we had final-drilled #30 all of the #40 holes, now we followed the instructions closely and completed step 5.
50iS/U-12: Step 1, 4 were completed, now that we had our F-14103 all of the holes could be riveted.
50iS/U-13: We connected the SCAT tubes and sealed the gaps on the vents using RTV, steps 4 and 6.