Powered By Kitlog Pro v2.0
GA Aerospace’s Web Site
RV-12iS A
All
11-16-2018
< Previous Log Entry
Next Log Entry >
Date:
11-16-2018
Number of Hours:
17.03
Manual Reference:
Brief Description:
46iS-05, 46iS-06, 27iS-03
46iS-05 1 - 9
1: NA
2: NA
3: To final drill the hole 3/8, we used a step-drill and a series of smaller drill bits.
4: NA
5: NA
6: NA
7: NA
8: NA
9: As the manual says, final torque given was between 160 in/lbs and 190 in/lbs.
46iS-06
2: RTV was used to join the Fire Sleeve.
3: NA
27-03 1,2
1: NA
2: NA
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
RV-12iS A Home
Category
# Logs
# Hours
All
415
3504
Avionics
28
237
Batteries Log
1
Empennage
30
233
Engine
1
2
Finish Kit
83
612
Fuselage
92
885
Inventory
3
20
PAP
8
Powerplant
35
371
Service Bulletin
24
37
Tools
1
18
Training (Emp. Team)
11
68
Training (Fus. Team)
25
336
Training (Wings Team
21
215
Wings
52
470
Copyright © 2001-2024 Matronics. All Rights Reserved.