Powered By Kitlog Pro v2.0
GA Aerospace’s Web Site
RV-12iS A
All
8-15-2018
< Previous Log Entry
Next Log Entry >
Date:
8-15-2018
Number of Hours:
2.00
Manual Reference:
Brief Description:
Sec 36 36A-11
Date: 8/15/18
# Hours: 2hrs
Page: 36A-11
Note: We tried to install the both fairing but the holes were not aligned, we consulted with Van’s the problem and they confirmed that we could drill a bigger hole as long as the holes are not bigger than the screw head.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
RV-12iS A Home
Category
# Logs
# Hours
All
415
3504
Avionics
28
237
Batteries Log
1
Empennage
30
233
Engine
1
2
Finish Kit
83
612
Fuselage
92
885
Inventory
3
20
PAP
8
Powerplant
35
371
Service Bulletin
24
37
Tools
1
18
Training (Emp. Team)
11
68
Training (Fus. Team)
25
336
Training (Wings Team
21
215
Wings
52
470
Copyright © 2001-2024 Matronics. All Rights Reserved.