We skipped **Page 32iS/U-02** because we needed steps on page 29iS/U-02 completed beforehand.
On **Page 29iS/U-08** we completed the following steps:
1. The edges did not match with the skins so we used a piece of wood and placed between the fuselage to help us push the longerons so that the parts were aligned.
2. N/A
On **Page 32iS/U-02**:
1. N/A
2. N/A
3. We used sockets to fit the bearing in between the part.
4. N/A
5. The only note about this is to be very careful not to damage anything while inserting the control column.