KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  5-16-2018
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Page 26iS/U-05 Fuel Tank

We worked on page 26iS/U-05 today, started with steps 1 and 2 to prepare to work uninterrumped while riveting and sealing the fuel tank.
Continued with the first operation about top skin and rib flanges. steps 3 to 10 were performed (proseal was used)

Team: Angel and Ismael
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.