KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  5-15-2018
Number of Hours:  12.00
Manual Reference:  
Brief Description:  Pages 24iS/U04 to 07

Today step 4 was performed 24iS / U-07 in this step the parts F-01207C-L-1 & R-1, F-01207D-L-1 & R-1 and F-1207A after the nutplates were installed in these parts, step 9 24iS / U-07 was also advanced by installing 2 screws of the total 4.

steps 1 to 5 23iS / U-05 were performed in step 1, parts F-1202E-R were riveted to F-01202F-1 and also part F-01203G-R to F-01203A-1. In step 2, match-drill # 30 in the forward tab of f-01248-R to F-01202E-R and the tab to F-1204H were performed after they were removed and debugged. In step 3, the pieces called before mentioned with rivet LP4-3 were riveted.

Steps 3 to 7 23iS / U-04 were also performed. The piece F-1203H-L & R was cut. In step 4, 2 holes were drilled in part F-1203G-R, then in step 4 part F-1203H-L was riveted to F-1203G -R with rivets LP4-3 in steps 5 and 6 was made dimpling # 30 in the piece F-01234-R-1 and in the piece F-01255-R-1 was countersinked # 30 using the piece before mentioned as a guide and verifying that they were adjusted without Gap signals.

Team: Andrea, Alvaro and Angel
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.