Date: 5-5-2018
|
Number of Hours: 16.00
|
Manual Reference:
|
Brief Description: Page 22iS/U-04
|
|
Today, step 6 22iS / u-04 was finished, in which the parts wd-1204 were riveted. These parts had not been installed because they required some CR3213-4-3 squares, they were able to be placed after that. The area of u8203u8203 wings will lend us theirs and these will be replaced later.
Steps 4, and 5 22iS / U-05 were also carried out, first a light layer was applied between the piece F-01201B-1 and F-01201C-1, the sealant was mixed in a 100: 10 poportion of the components A: B, both substances were weighed in a digital scale and then mixed homogeneously and finally applied in the aforementioned parts, this process took a little longer because when the sealant was spread, a topechap had to be made to achieve a aesthetic finish. Finally steps 6, 7, 8, 9 22iS / U-05 were carried out in these steps 2 screws MS24694-C14 were placed pressing them with a torque of 32 Thready Qty Per Inch.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|