KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  4-24-2018
Number of Hours:  16.00
Manual Reference:  
Brief Description:  Page 21is/U-18, U-19 and U-21

Team: Andrea Limon, Magdalena Rios, Angel Rodriguez, Alvaro Lopez

step 4 21is / u-21 was carried out, which consists of riveting piece F-00020 to F-1276-1.
Step 5 21is / u-21 was carried out, which consists only of applying boelube to the stud screw.par
in step 6 21is / u-21 the six ststem block studs and nuts were installed inF-01266-6 at the locations depicted.
Step 4 was carried out, 21is / u-18, which consisted in installing rows and then riveted all the Rib assembly and f-01212-L-1 & R-1 to F-003A-1.
Step 5, 6, 7, 21is / u-18 was completed in these steps, ribs were riveted to parts f-0103A-1 and F-0102F-1, the manual riveter and a wedge were used. In this step it is not allowed to perform a final-drill in the angles that have already been applied first, this with the end of not releasing the first applied.
in step 8 21is / u-18 bushing into the holes in the bulkheads were installed, then in step 9 the piece HW-00014 to F-01202F-1 was riveted.
Also, step 7 21is / u-19 was carried out in this step. Clecos were installed in parts F-1274-R to F-0102F-1, F-01212-R-1 and F-1275A-R, in step 8 these parts were riveted except for the indicated holes, because these will then be riveted to the lower skin or floor. in step 9, step 7 was repeated but on the left side.
}
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.