|
|
|
|
GA Aerospace’s Web Site
|
Date: 4-23-2018
|
Number of Hours: 8.00
|
Manual Reference:
|
Brief Description: Page 21iS/U-17 and U-21
|
|
Team: Andrea Limon, Magdalena Rios, Eduardo Duran, Angel Rodriguez, Alvaro Lopez
Step 5 21iS / U-17 was carried out, which consisted in placing the clecos and then riveting the angles to the ribs F-01212-R-1, F-01212-L-1, using the manual riveter and rivets LP4-3. Step 1 and 2 were carried out. 21iS / U-17 In these steps, dimpling was performed on the holes of the pieces F-01202F-1, these steps were carried out with the big riveter C and with dice number 30. In step 3, the dimpling #40 was performed on the 4 holes where the nutplates were placed. Step 1 was verified 21iS / U-21 and only consists of going to step 2. After this step was carried out in which it was made dimpling to the holes where the nutplates were placed in piece F-01276-1. After step 3 was made in which the nutplates were riveted in this same piece. rivets K1000-08D and rivets AN426AD3-3 were installed.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |