KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  4-18-2018
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Page 21iS/U-12 Steps 2,3,4,5

Team: Alvaro Lopez, Juan Isiordia, Angel Rodriguez
Abscent:0

Step 2 21iS / u-12 that consisting of riveting parts F-1204CL-L & to the left seat fluor using the LP4-3 rivets, in this step the rivets were placed using the manual riveter was performed.

the step 3 21iS / u-12 was carried out, riveting the piece 1204H to the forward side of f-0120b-l-1 and forward side of f-1204H to the forward F-0120B-L-1 and the forward side of f-1204CL-L using rivets LP4-3.

Step 4 21iS / u-12 was carried out and the callet bushing into s-1204M then installed them on the f-01204b-l-1 and f-120cl-l using the hardware (an3-24a nas49f03 this step was the same in the step 6) .

step 5 21iS / u-12 was performed, piece f-1204H was riveted to the forward side of the f-1204b-r-1 and f-120cl-r using rivets LP4-3.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.