KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  4-17-2018
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Page 21iS/U-13 and 14

Team: Andrea Limon, Magdalena Rios, Alma Elguezabal, Eduardo Duran

Abscent: 0


Each time we advance more and each step is easier since we are getting skills in both the interpretation of the plan and in each activity that is indicated. We finish step 5 of page 21iS / U-13 where we place the rivets for the pieces F-01203A-1 both on the right and left side using rivets LP4-3 just where the plane indicates it. In step 6 we filed the pieces F-1203C to verify that the piece fits in the Stub Spar to ensure its assembly with the wings. In step 7 we placed clecos in the piece
F-1203C and F-1203D together with the F-01203A-1 some holes were passed the drill # 30 to ensure that they do not get stuck, this step was made on the right and left side. Step 2 on page 21iS / U-14 riveted parts f-1203E-L and R on both sides of piece F-01203A-1 together with la F-1203C and F-1203D-L and R using rivets AN470AD4- 8 This step has not been completed, we will continue tomorrow.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.