Team: Andrea Limon, Magdalena Rios, Alma Elguezabal
Abscent: Eduardo Duran
Wen get a bigger advance day by day in the fuselage assembly, today we advanced in page21iS / U-09 in steps 2,3,4 and 5. In step 2 we made countersink # 40 to the holes of the pieces F-012679 that carry nutplate and then in step 3 we put rivets CCR264SS-3-2 to these same pieces and rivets AN426AD3-3 to the two F-01267A pieces that carry nutplate K1000-08D as it says the step 1 of this page. In the step 4 we placed rivets to each piece F-01267A-1 and B-1 to the Flaperon Mixer Bracket / Seat Rib Assembly to rib # 2 using LP4-3. Then in step 5 we put the pieces F-01267A-1 and B-1 to the PulleyBracket / Seat Rib Assembly and the rib # 7 with rivets LP4-3 In step 1 of page 21iS / U-13 we cut and separated piece F-1203B turning them in L and R. Then in the step 2 we did the same but in piece f-1203D also in R and L. In the step 3 we made countersink # 30 with 120 ° and countersink 40 in piece F-01203A-1, only in the place where indicate the drawing On page 21iS / U-14 we did step 1 and 2, in both we cut and separated pieces and then we deburred.