KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  4-11-2018
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Page 21iS/ U05

Team: Alvaro Lopez, Angel Rodriguez, Juan Isiordia

abscent:0

The AN426AD4-8 rivets that had been replaced by the an470ad4-8 from step 11 of page 20is / U-05 were placed.

Step 6 was also finished 20is / u-02 installating rivets ad-48-abs some of these rivets were removed
because there was a gap between the riveted sheets.
Step 7 of page 20is / u-02 was finished in which nutplates were installed in parts f-01206ª-1,
F-01206H-L-1 & R-1 to parts F-01224-L-1 & R-1 using rivets AN426AD3-3.5 and CCR264SS-3-2.
' style=

Pop rivets

Pop rivets

' style=

nutplates installed

nutplates installed

' style=

Rivet AN426AD-3/CCR264SS-3-2

Rivet AN426AD-3/CCR264SS-3-2

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.