Team: Eduardo Duran, Andrea Limon, Magdalena Rios, Alma Elguezabal
Abscent:0
Step10, repleced clecos on piece rib#5, F-01299-L and F-1216R, after we drilles the common holes of this all parts with drill bit #30 then riveted with LP4-3. This step was repeated in the rib #1 and add the pieces F-12102A-L y F12102B in this same rib
Step11: Clecos were installed in the pices F-1216L, F-1299R/L and rib #4 for later riveted with LP4-3. We repeat this step in rib #8 and add F-12102A and F-12102B in the same rib