KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  3-15-2018
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Page 21 iS-U-05 step 7

Team: Eduardo Duran, Andrea Limon, Magdalena Rios, Alma Elguezabal

Abscent:0

We worked in step 7 of page 21iS / U-05, it refers to riveting the pieces F-1250-L and R together with the piece F-1220-a and B with rivets LP4-3. Then we made step 9, rivet the two F-1218 to the F-1220A and B with the same rivets from the previous step. Finally, step 10 was carried out, we machined countersink to the holes of piece f-01219A-1 and then joined them with nutplates MK1000-428 conremaches AN426AD3-3.5
' style=

Deburring with scotch brite

Deburring with scotch brite

' style=

Rivet pop

Rivet pop

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.