KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  2-20-2018
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Back rivet

Team: Alvaro Lopez, Alma Elguezabal, Eduardo Duran, Luis Isiordia, Angel Rodriguez, Andrea Limon, Magdalena Rios

Abscent: 0

The team continued with the last project riveted the second rib with the manual riveter correctly. First the plate was riveted to the crossbar for later next to with the rib, for each rivet installed was made a inspection with the specific gage.

the team placed a saw band for wood to make a wedge that we will use to rivet in positions that are not parelles with the piece.
Observation.- one rivet was wront installed in the bucking bar process, it was holden incorrectly because the position didnt allow it, the rivet was removed by drilling it with a #40 drill and then with a #30, finally it was removed with a cutting clip, the bucking bar process was repited and the team maneged do it correctly, moving the vise and holding the bar tightly.
' style=





' style=

Rivet with damage

Rivet with damage

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.