KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  3-8-2018
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Pag 07-03 iS

Daniel Ruiz, Ulises Valle, Ismael Ramonet

Abscent:0

This day we continued on the next page 07-03 of the manual. We skipped the step 1 because we needed the section 6 assembly that we left for later (we are waiting the shipping of a damaged part replace) So we start doing the steps 2, 3 and 4 in the same page that consist on riveting que upper hinge and the step 1 of page 07-04 mostly of them with a hand squeeze rivet.
Tip. One member on the team will squeeze the rivet and the other will take an eye checking the correct allignment all the time.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.