|
|
|
|
GA Aerospace’s Web Site
|
Date: 2-19-2018
|
Number of Hours: 12.00
|
Manual Reference:
|
Brief Description: 2nd Project Assembly
|
|
Team: Alvaro Lopez, Eduardo Duran, Luis Isiordia, Angel Rodriguez, Andrea Limon, Magdalena Rios
Abscent: Alma Elguezabal
We continued with the last training project, the ribs were installed next to the spar, first the two parts were drilled with presses, a plate was installed behind the spar, this acts as a support on the ribs and the spar. We made sure that the ribs were placed symmetrically. later the pieces were riveted with rivets #30 type crushed. observations. - one of the rivets was placed incorrectly, the new configuration was not checked after its realization and this deformed a part of the rib, as a consequence it was opted to change the tool, replacing the neumatic riveter with a manual riveter. Recommendations.- Each hole must be deburred after drilling and after making a configuration it must be checked.
|
|
Stiffeners with dimpling
|
|
Clecos
|
|
Gap by riveting squeeze
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |