Date:  2-17-2018
Number of Hours:  42.00
Manual Reference:  
Brief Description:  2nd Project assembly

Team: Alvaro Lopez, Angel Rodriguez, Luis Isiordia, Andrea Limon, Eduardo Duran, Alma Elguezabal, Magdalena Rios

At the beginning of the day the team drilled the pieces and for each hole that was made a cleco was placed in it and the same was done when the rivets were placed.
1rs Observation.- 1/8 rivets were installed (Flat, round, POP), an error was made when the first rivet was placed (a force was applied that bent the plates).
2nd observation.- one of the placed rivets was removed because it was incorrectly placed, starting marking the center of the rivet with a marker, then it was barred with a drill #40 and then with a #30, finally it was removed with tweezers.

We continued with the last project starting with drilling the skins together with the stiffener, These were dimpled for a later riveting.
Recommendations.- in the process Bucking bar take the pneumatic gun with both hands and avoid removing the gun when the trigger is activated.

Team were cleaning hangard.14 hours