KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  2-12-2018
Number of Hours:  4.00
Manual Reference:  
Brief Description:  2nd Setup Project

Members: Daniel Martinez, Ismael Romo, Jose Guerrero

Absent: 0


Today we started working on the first part of the second training kit, that’s because this kit includes two projects.
The first project is actually simple, one aluminum sheet that assembles to another and an angle.
Most of the day was used so we could comprehend the instructions and minimize errors this way, we separated the various rivets that were included with the kit so we can find them easily when we need them. We also created a wood tool that we’ll need in the future and will also be useful for the actual plane assembly.
The hardest thing about this project is that we need to drill the holes from scratch, we measured and drilled the ones that connect the first aluminum sheet to the angle. Tomorrow we’ll continue working on this.
' style=

Tools and drawing

Tools and drawing

' style=

Tool Desing

Tool Desing

' style=

Setup tool

Setup tool

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.