Members:Alvaro Lopez, Angel Rodriguez and Luis Isiordia
Absent: 0
This day each team had a training of backing bar, in this training we learned the right way to handle both bar and neumatic gun. Then the team continued with the rivet process, using a manual Riveter and rivets AN4264D3-3.5 (3/32"), until the step fer cut the hinge with the right long.