KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  2-3-2018
Number of Hours:  32.00
Manual Reference:  
Brief Description:  Location

Members: Alma elguezabal, Andrea Limon, Eduardo Duran, Alvaro Lopez, Angel Rodriguez and Luis Isiordia, Magdalena Rios

Absent: 0

On this day we created a shelf on the wall to place the large pieces and the small pieces were placed in raks. Letters and numbers were assigned to each location as shown in the photographs, in order to quickly locate each part at the time of being used.

Other activities were made por the teams are:

· A table with recycled wood from the boxes
· The drawings of the plane were placed on a wall for everyone's disposition
· A crane was assembled to be available at the time of mounting the engine
' style=

Inventory

Inventory

' style=

Subkits

Subkits

' style=

Traveling crane

Traveling crane

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.